Kitchens
$28,000 to $65,000
Layout changes, cabinets, counters, tile, lighting and the electrical to carry all of it. If the plan calls for taking out a wall, we size and install the beam rather than working around the wall you wanted gone.
Porter, Lake and LaPorte counties
(219) 555-0137
Remodeling and additions · Northwest Indiana
Kitchens, bathrooms, basements and additions. You get a written scope, one price and a start date before anything gets torn out.
Licensed and insured · Valparaiso, Chesterton, Portage, Crown Point, Merrillville, Michigan City and La Porte
What we build
We are a remodeling contractor, not a handyman service. The work below is what we do every week, and the ranges are what jobs like it have cost.
$28,000 to $65,000
Layout changes, cabinets, counters, tile, lighting and the electrical to carry all of it. If the plan calls for taking out a wall, we size and install the beam rather than working around the wall you wanted gone.
$14,000 to $32,000
Gutted to the studs, waterproofed properly behind the tile, then vanity, fixtures and trim. Hall baths, primary suites, and curbless showers where the floor framing allows for the drop.
$30,000 to $70,000
Framing, insulation, egress windows where the code requires one, bathrooms and wet bars. If the basement takes water, that gets solved first, because finishing over a wet wall only hides it for a season.
From about $95,000
Foundation, framing, roof tie-in and every finish inside. Family rooms, primary suites, sun rooms and second story work, with the heating and cooling extended to cover the new space instead of left to a plug-in heater.
$9,000 to $22,000
Pressure treated, cedar or composite, built on footings dug below the frost line our county requires, with the ledger flashed so the rim joist behind it stays dry.
$12,000 to $38,000
Full siding replacement with trim, soffit and fascia, and window units set, shimmed square and flashed so water that gets behind the cladding finds its way back out.
Those ranges are examples, not quotes. What actually moves a price is what is behind the wall: the age of the wiring, whether the panel has room, how the floor is framed, and what the last person to work on the house left for us. We look at all of it before we give you a number.
Projects
Scope, how long we were in the house, and what we found once the walls were open. The write-ups and captions here are examples for this demonstration.
Project 01 · Chesterton
The wall between the kitchen and the dining room was carrying load, so the first week went to temporary walls and a beam, which is a week the owners paid for and could not see. After that the two rooms read as one. Cabinets run to the ceiling, quartz on the perimeter and the island, and the range moved to an outside wall so the hood vents straight through instead of running duct across the ceiling.
Project 02 · Valparaiso
Three bathrooms in one house is really three small projects run back to back, so we staged them to leave the family a working shower the whole time. The hall bath went first, then the primary suite, then the powder room while the tile upstairs cured. Both plumbing stacks were opened and the supply lines replaced while the walls were apart, which is the cheapest that work will ever be.
Project 03 · Crown Point
There was a small back room nobody used and no good way to get to the yard. We took it down to the footing, poured a new foundation out to the setback, and tied the new roof into the existing ridge so it does not read as an addition from the driveway. Inside, the fireplace wall got stone and site built shelving, and the furnace was sized and the ductwork extended to actually carry the new room.
Process
Most of what goes wrong on a remodel goes wrong before anyone picks up a tool. This is the order we do it in, every time.
Ten minutes on the phone. What you want done, roughly when, and whether the work you are describing and the budget you have in mind are in the same neighborhood. If they are not, we say so on that call rather than after a design fee.
We come out, measure, and look at the parts of the house you do not: the panel, the attic, the crawl space, the joist direction. That visit is where the surprises get found, and finding them now is what keeps the price still later.
You get a document listing what is included, what is not, and the allowances for tile, fixtures and cabinets, with one price at the bottom. Drawings come with it when the work needs them.
We pull the permits and book the inspections. You get a start date, a finish date and the week by week sequence of who will be in your house. Long lead items are ordered before demolition, never after.
One lead carpenter runs your job and is there most days. You get a number that reaches a person. Anything that changes the price becomes a written change order before the work happens, not a line on the final invoice.
We walk the job together and write down everything you are not happy with. That list is finished before the final payment, and the warranty and the lien waivers come with it.
What people say
Example wording
These three quotes were written for this demonstration. A real site carries the owner's own customers, in their own words, with nothing invented around them.
They found the bearing wall on the first visit, not in week three. The price never moved after that.
Our hall bath was out for nineteen days and they told us about three weeks. That is the whole review.
Every change we asked for came back as a piece of paper with a number on it before anyone started.
Licensing and insurance
Example Remodeling Co. is licensed and insured. We carry general liability and workers compensation coverage, and the certificates go to you by email before you sign anything, not after you ask twice.
If your lender, your insurer or your homeowners association wants to be named as a certificate holder, tell us and we will have it issued. Permits are pulled in our name, and every inspection on your job is scheduled by us.
Plumbing, electrical and mechanical work is done by licensed trades. They are the same few crews on every job, which is the only reason a schedule means anything.
Service area
Porter, Lake and LaPorte counties. Jobs this size need us in the house most days, so we keep the drive short on purpose.
Consultation
The consultation is free and there is no design fee to find out whether we are the right fit. Takes about a minute to send.
Sent at 9:14 pm. Expect a reply tomorrow morning.
If it is easier, call (219) 555-0137 and mention your street.
Demonstration form. Nothing was sent anywhere.
Questions
A bathroom is usually three to five weeks on site. A kitchen is six to nine. An addition runs twelve to twenty, depending on the foundation and the weather we get during it.
The honest part is that cabinet and window lead times sit outside our control, so we order the long items and get a confirmed delivery date before demolition starts. A kitchen with no cabinets in it is not a remodel, it is a camp site.
We do, in our name. Structural changes, new plumbing, new circuits and mechanical work all need one, and the inspections are scheduled by us and passed before the wall closes.
A contractor offering to skip the permit is offering to hand you the problem. It surfaces when you sell, or when an insurer asks who did the work.
We stop, take a photo, and call you the same day with what it is, what it costs to do right, and what it does to the schedule. Then it becomes a written change order that you sign before the work happens.
On an older house something almost always turns up: cloth wiring, a drain stack in the wrong bay, a header that was never there. We carry an allowance for it in the proposal so it is a conversation and not a crisis.
In writing, with a price and a schedule impact, signed before anyone starts. That applies to what we find and to what you change your mind about, which is genuinely fine, it just has to be on paper first.
A deposit to hold your place on the schedule and order materials, then draws tied to stages you can walk in and see: demolition and framing complete, rough inspections passed, drywall and cabinets set. The final payment comes after the punch list is finished, not before.
No stage is ever billed before the work in it is done. If a contractor wants most of the money up front, that tells you something about the rest of their schedule.
For a kitchen, a bathroom or a basement, almost always. We build a dust wall, protect the floors on the path in and out, and keep one bathroom working. You will want a plan for cooking during a kitchen, and we will tell you which weeks are the loud ones.
For a large addition, most families stay put. The house stays sealed until the new roof is on and dried in.
A lead carpenter who runs your job and is there most days, plus our own crew. Plumbing, electrical and mechanical work goes to licensed trades we use on every job, so they know how we build and you are not meeting a new face every week.
Below about five thousand dollars we are usually the wrong call, and we will say so and point you toward someone who is a better fit. We would rather do that than send you a price designed to make you go away.
Yes. Example Remodeling Co. carries general liability and workers compensation coverage, and we email the certificates before the contract is signed. If you want to be named as a certificate holder, ask and we will have it issued.
Hours and contact
Consultations are usually booked in the late afternoon or on a Saturday morning, because that is when most people are home and can walk the house with us.